Pitcairne and Hobart house type S4

download as PDF
Download
as PDF
Pitcairn close is part of a new build development consisting 42 residential dwellings.
Images Graphs Figures Description Strategies Building

No images have been supplied for this project

 

CO2 emissionsPrimary energy requirement
Energy target
AECB Silver

Energy and fuel use

Fuel use by type
Primary energy requirement
CO2 emissions
Renewables

Measured data from renewable generation is not yet available.

Fuel use

 Pre-developmentForecastMeasured
Electricity use - - -
Natural gas use- - -
Oil use- - -
LPG use- - -
Wood use- - -
Other Fuel - - -
 Pre-developmentForecastMeasured
Primary energy requirement - - -
Annual CO₂ emissions - - -
Annual space heat demand - - -

Renewable energy

Electricity generationForecastMeasured
Renewables Technology--
Other Renewables Tech--
Electricity consumed by generation --
Primary energy requirement
offset by renewable generation
--
Annual CO₂ emissions
offset by renewable generation
--

Calculation and targets

Whole house energy calculation method PHPP
Other whole house calculation method-
Energy target AECB Silver
Other energy targets-
Forecast heating load -

Airtightness

 DateResult
Pre-development air permeability test--
Final air permeability test--

Project description

StageUnder construction
Start date05 May 2014
Occupation date13 April 2015
Location Nottingham Nottinghamshire  England
Build typeNew build
Building sectorPublic Residential
Property typeSemi-Detached
Construction typeMasonry Cavity
Other construction type100 Facing brick 200 ecobead insulated cavity 100 internal block
Party wall constructionCavity party wall 2 skins 100 dense block with insulated cavity
Floor area 123
Floor area calculation method Treated Floor Area (PHPP)
Building certification  AECB silver standard certified building AECB silver standard certified building

Project Team

OrganisationWilliam Davis Limited
Project lead personWilliam Davis Limited
Landlord or ClientBlue Print Limited Partnership
ArchitectMarsh Grochowski Architects
Mechanical & electrical consultant
Energy consultantEco Design Consultants Limited
Structural engineer
Quantity surveyorPulse Associates Ltd
Consultant
ContractorWilliam Davis Limited

Design strategies

Planned occupancyThe development is planned to start occupancy in 2015. The Picairn and Hobart development has 42 units and will be phased occupancies
Space heating strategyEach unit has an individual condensing mains gas boiler to water filled radiators
Water heating strategyEach unit has an individual hot water cylinder heated from the gas boiler
Fuel strategyMains Gas as primary heat source
Renewable energy strategyNo renewable electricity generation.
Passive Solar strategyAll units modelled in PHPP for orientation
Space cooling strategyBackground ventilation by MVHR purge ventilation by opening windows
Daylighting strategykitchen to achieve a daylight factor of =2%.living rooms to achieve a daylight factor of =1.5%
Ventilation strategyMechanical ventilation with heat recovery - system 4 for background ventilation
Airtightness strategy Ensuring properly detailed junctions and site supervision and on site inspection with signed check list sheet. VCL membrane to roof airtight tape joints to structure
Strategy for minimising thermal bridges Specific details at all junctions - with an on site inspection and check list sheet with signatures.
Modelling strategyPassive House Planning Package used to model energy strategy.
Insulation strategyWall U value = 0.15 W/mK. Roof U value =0.09w/mK. Floor U value = 0.14W/mK
Other relevant retrofit strategies
Contextual information

Building services

Occupancy
Space heatingMains gas condensing Combi Boiler
Hot waterDomestic hot water by Combi boiler
Ventilation
ControlsRoom thermostats
CookingGas
LightingCompact Fluorescent lighting through out
Appliancesunknown
Renewable energy generation systemNo installation
Strategy for minimising thermal bridgesDetails designed and check on site with in progress site photos and site sign off check list to confirm the work is carried out as designed.

Building construction

Storeys
Volume -
Thermal fabric area -
Roof description 10 Degree Mono pitch cold roof construction - insulated at ceiling joist level with 450mm mineral wool
Roof U-value 0.89 W/m² K
Walls description Masonry cavity wall brick facing to outer leaf 200mm Eco Bead cavity insulation 100mm Block inner wall - 13mm wet plaster internal finish
Walls U-value 0.15 W/m² K
Party walls description Masonry cavity party wall with thermal closer pieces each end of wall to avoid thermal chimneys to Building Regulation
Party walls U-value -
Floor description Ventilated block and beam floor with 150mm insulation with 45mm screed topping
Floor U-value 0.14 W/m² K
Glazed doors description
Glazed doors U-value - -
Opaque doors description
Opaque doors U-value - -
Windows description
Windows U-value - -
Windows energy transmittance (G-value) -
Windows light transmittance -
Rooflights description
Rooflights light transmittance -
Rooflights U-value -