Measured data from renewable generation is not yet available.
Pre-development | Forecast | Measured | |
Electricity use | - | 2500 kWh/yr | - |
---|---|---|---|
Natural gas use | - | 6000 kWh/yr | - |
Oil use | - | - | - |
LPG use | - | - | - |
Wood use | - | 1500 kWh/yr | - |
Other Fuel | - | - | - |
Pre-development | Forecast | Measured | |
Primary energy requirement | - | 80 kWh/m².yr | - |
---|---|---|---|
Annual CO₂ emissions | - | 15 kg CO₂/m².yr | - |
Annual space heat demand | - | 15.3 kWh/m².yr | - |
Electricity generation | Forecast | Measured |
---|---|---|
Renewables Technology | - | - |
Other Renewables Tech | - | - |
Electricity consumed by generation | - | - |
Primary energy requirement offset by renewable generation | 80 kWh/m².yr | - |
Annual CO₂ emissions offset by renewable generation | 15 kg CO₂/m².yr | - |
Whole house energy calculation method | PHPP |
---|---|
Other whole house calculation method | - |
Energy target | PassivHaus |
Other energy targets | - |
Forecast heating load | 8.5 W/m² demand |
Date | Result | |
Pre-development air permeability test | - | - |
---|---|---|
Final air permeability test | 13 June 2014 | 0.45m³/m².hr @ 50 Pascals |
Stage | Under construction |
---|---|
Start date | 01 March 2013 |
Occupation date | 25 July 2014 |
Location | Shere, Guildford Surrey England |
Build type | New build |
Building sector | Private Residential |
Property type | Detached |
Construction type | Softwood frame |
Other construction type | Blown cellulose insulation with cavity face brick/stonework |
Party wall construction | |
Floor area | 185.5 m² |
Floor area calculation method | Treated Floor Area (PHPP) |
Building certification | AECB silver standard certified building |
Organisation | Cocreate Consulting |
---|---|
Project lead person | Will South |
Landlord or Client | Low Energy Developments |
Architect | JAG Architechs |
Mechanical & electrical consultant | subcontractor design |
Energy consultant | Cocreate Consulting |
Structural engineer | |
Quantity surveyor | |
Consultant | |
Contractor | Low Energy Developments, Ecohomes (Ireland), Integraspec ICF |
Planned occupancy | Between 2 and 6 full time residents, design amended during construction for 2 full time residents. |
---|---|
Space heating strategy | Condensing gas fired system boiler feeding a thermal store and steel panel radiators. |
Water heating strategy | Condensing gas fired system boiler feeding a thermal store. Radial microbore distribution pipework. |
Fuel strategy | Mains Gas |
Renewable energy strategy | None |
Passive Solar strategy | Large double storey lightwell to ground floor and basement to make use of limited solar gain to site. |
Space cooling strategy | Large deciduous tree in front of house. Secure openings to quiet and private gardens, and rooflight at the top of stair well. |
Daylighting strategy | |
Ventilation strategy | Brink Renovent 300 Ventilation with heat recovery. Manifold and semi-flexible ductwork distribution |
Airtightness strategy | 15mm OSB with junctions taped |
Strategy for minimising thermal bridges | |
Modelling strategy | PHPP |
Insulation strategy | ICF basement with additional external EPS. I-joist timber frame by Ecohomes above ground, fully filled with Cellulose insulation blown on site. Cold roof with blown Cellulose insulation. |
Other relevant retrofit strategies | |
Contextual information | Very strict local planning laws in the Surrey Hills AONB and green belt. Site gently slopes to the North and has excellent views in this direction. |
Occupancy | 2 residents full time |
---|---|
Space heating | SEDBUK A rated mains gas condensing system boiler feeding thermal store. Flat panel radiators. |
Hot water | SEDBUK A rated mains gas condensing system boiler feeding thermal store. Plastic microbore radial distribution from manifold next to tank. |
Ventilation | Whole house ventilation with heat recovery (MVHR). Passivhaus Certified Brink Renovent 300 unit (84% efficiency). Distribution to manifold and semi flexible U-bink ducting. Recirculating cooker hood in kitchen. |
Controls | Three stage fan controller in plant room. |
Cooking | Gas hob and electric oven |
Lighting | |
Appliances | |
Renewable energy generation system | |
Strategy for minimising thermal bridges |
Storeys | 3 |
---|---|
Volume | 528m³ |
Thermal fabric area | 568 m² |
Roof description | Half 'room in the roof' truss roof, fully filled with blown cellulose insulation. |
Roof U-value | 0.09 W/m² K |
Walls description | Basement ICF with additional EPS external insulation. Above ground closed panel timber frame fully filled with blown cellulose insulation. Cavity and face brick/stone work, hung tiles to first floor. |
Walls U-value | 0.09 W/m² K |
Party walls description | |
Party walls U-value | - |
Floor description | Floating structural raft using EPS formwork foundation system. |
Floor U-value | 0.11 W/m² K |
Glazed doors description | Rationel french doors |
Glazed doors U-value | - installed |
Opaque doors description | |
Opaque doors U-value | 1.40 W/m² K installed |
Windows description | Rationel Aura windows |
Windows U-value | 0.90 W/m² K installed |
Windows energy transmittance (G-value) | 50 % |
Windows light transmittance | - |
Rooflights description | Fakro U6 triple glazed rooflight |
Rooflights light transmittance | 50% |
Rooflights U-value | 1.14 W/m² K |