The Glebe, East Lothian Housing Association, Scotland

download as PDF
Download
as PDF
Four x 2 bedroom flats built to Passivhaus standard for East Lothian Housing Association.Build Requirement: Four x 2 bedroom flats built to Passivhaus standardLocation: The Glebe, East Saltoun, East LothianClient: East Lothian Housing Association.Construction: Beattie Passive Approved Contractor Lomond Group. Ross Jamieson, Site Foreman for Lomond Group attended the Beattie Passive Training Academy.Apartment Sizes: 74sqm, 69sqm, 80sqm, 74sqm = total of 297sqm
Images Graphs Figures Description Strategies Building

The Glebe, East Lothian Housing Association, Scotland : Project images

Click on image to preview full size

084-scaled-1200x600-c.jpg
087-scaled-1200x600-c.jpg
east-lothian-passivhaus-one-1920x1080.jpg
CO2 emissionsPrimary energy requirement
Energy target
PassivHaus

Energy and fuel use

Fuel use by type
Primary energy requirement
CO2 emissions
Renewables

Measured data from renewable generation is not yet available.

Fuel use

 Pre-developmentForecastMeasured
Electricity use - - -
Natural gas use- - -
Oil use- - -
LPG use- - -
Wood use- - -
Other Fuel - - -
 Pre-developmentForecastMeasured
Primary energy requirement - - -
Annual CO₂ emissions - - -
Annual space heat demand - - -

Renewable energy

Electricity generationForecastMeasured
Renewables Technology--
Other Renewables Tech--
Electricity consumed by generation --
Primary energy requirement
offset by renewable generation
--
Annual CO₂ emissions
offset by renewable generation
--

Calculation and targets

Whole house energy calculation method
Other whole house calculation method-
Energy target PassivHaus
Other energy targets-
Forecast heating load -

Airtightness

 DateResult
Pre-development air permeability test--
Final air permeability test--

Project description

StageOccupied
Start date01 January 2014
Occupation date01 January 2015
Location East Lothian Lothian  Scotland
Build typeNew build
Building sectorPublic Residential
Property type
Construction type
Other construction type
Party wall construction
Floor area 297
Floor area calculation method Treated Floor Area (PHPP)
Building certification

Project Team

OrganisationBeattie Passive
Project lead personBeattie Passive
Landlord or Client
Architect
Mechanical & electrical consultant
Energy consultant
Structural engineer
Quantity surveyor
Consultant
Contractor

Design strategies

Planned occupancy
Space heating strategy
Water heating strategy
Fuel strategy
Renewable energy strategy
Passive Solar strategy
Space cooling strategy
Daylighting strategy
Ventilation strategy
Airtightness strategy
Strategy for minimising thermal bridges
Modelling strategy
Insulation strategy
Other relevant retrofit strategies
Contextual information

Building services

Occupancy
Space heating
Hot water
Ventilation
Controls
Cooking
Lighting
Appliances
Renewable energy generation system
Strategy for minimising thermal bridges

Building construction

Storeys
Volume -
Thermal fabric area -
Roof description
Roof U-value -
Walls description
Walls U-value -
Party walls description
Party walls U-value -
Floor description
Floor U-value -
Glazed doors description
Glazed doors U-value - -
Opaque doors description
Opaque doors U-value - -
Windows description
Windows U-value - -
Windows energy transmittance (G-value) -
Windows light transmittance -
Rooflights description
Rooflights light transmittance -
Rooflights U-value -