Bushbury Hill primary school was one of the first projects in the country to achieve Passivhaus certification in February 2012. The school was built to the same budget and completed in the same time frame as a traditional build. Due to the challenging nature of the site, there was extensive consultation with the school and its neighbours throughout the design and construction process.
Images Graphs Figures Description Strategies Building

Bushbury Hill Primary School : Project images

Click on image to preview full size

Bushbury_Hill.jpg
CO2 emissionsPrimary energy requirement
Energy target
PassivHaus

Energy and fuel use

Fuel use by type
Primary energy requirement
CO2 emissions
Renewables

Measured data from renewable generation is not yet available.

Fuel use

 Pre-developmentForecastMeasured
Electricity use - 80000 kWh/yr -
Natural gas use- - -
Oil use- - -
LPG use- - -
Wood use- - -
Other Fuel - - -
 Pre-developmentForecastMeasured
Primary energy requirement - 117 kWh/m².yr -
Annual CO₂ emissions - 28 kg CO₂/m².yr -
Annual space heat demand - 14 kWh/m².yr -

Renewable energy

Electricity generationForecastMeasured
Renewables Technology--
Other Renewables Tech--
Electricity consumed by generation --
Primary energy requirement
offset by renewable generation
117 kWh/m².yr -
Annual CO₂ emissions
offset by renewable generation
28 kg CO₂/m².yr -

Calculation and targets

Whole house energy calculation method PHPP
Other whole house calculation method-
Energy target PassivHaus
Other energy targets-
Forecast heating load 12 W/m² demand

Airtightness

 DateResult
Pre-development air permeability test--
Final air permeability test-0.53m³/m².hr @ 50 Pascals

Project description

StageOccupied
Start date
Occupation date01 October 2011
Location Wolverhampton West Midlands  England
Build typeNew build
Building sectorPublic
Property typeDetached
Construction typeOak frame
Other construction type
Party wall construction
Floor area 1707
Floor area calculation method Treated Floor Area (PHPP)
Building certification  Passivhaus certified building Passivhaus certified building

Project Team

Organisation
Project lead person
Landlord or ClientWolverhampton City Council
ArchitectArchitype
Mechanical & electrical consultant E3
Energy consultantNick Grant & Alan Clarke
Structural engineer
Quantity surveyor
Consultant
ContractorThomas Vale Construction

Design strategies

Planned occupancy
Space heating strategy
Water heating strategy
Fuel strategy
Renewable energy strategy
Passive Solar strategy
Space cooling strategy
Daylighting strategy
Ventilation strategy
Airtightness strategy
Strategy for minimising thermal bridges
Modelling strategy
Insulation strategy
Other relevant retrofit strategies
Contextual information

Building services

Occupancy
Space heating
Hot water
Ventilation
Controls
Cooking
Lighting
Appliances
Renewable energy generation system
Strategy for minimising thermal bridges

Building construction

Storeys
Volume -
Thermal fabric area -
Roof description
Roof U-value -
Walls description
Walls U-value -
Party walls description
Party walls U-value -
Floor description
Floor U-value -
Glazed doors description
Glazed doors U-value - -
Opaque doors description
Opaque doors U-value - -
Windows description
Windows U-value - -
Windows energy transmittance (G-value) -
Windows light transmittance -
Rooflights description
Rooflights light transmittance -
Rooflights U-value -