Measured data from renewable generation is not yet available.
Pre-development | Forecast | Measured | |
Electricity use | 3900 kWh/yr | - | 3535 kWh/yr |
---|---|---|---|
Natural gas use | 16000 kWh/yr | - | 7625 kWh/yr |
Oil use | - | - | - |
LPG use | - | - | - |
Wood use | - | - | - |
Other Fuel | - | - | - |
Pre-development | Forecast | Measured | |
Primary energy requirement | 331 kWh/m².yr | - | 207 kWh/m².yr |
---|---|---|---|
Annual CO₂ emissions | 66 kg CO₂/m².yr | - | 43 kg CO₂/m².yr |
Annual space heat demand | - | - | - |
Electricity generation | Forecast | Measured |
---|---|---|
Renewables Technology | - | - |
Other Renewables Tech | - | - |
Electricity consumed by generation | - | 10 kWh/yr |
Primary energy requirement offset by renewable generation | - | 207 kWh/m².yr |
Annual CO₂ emissions offset by renewable generation | - | 43 kg CO₂/m².yr |
Whole house energy calculation method | SAP |
---|---|
Other whole house calculation method | - |
Energy target | 2002 Building Regs |
Other energy targets | - |
Forecast heating load | - |
Date | Result | |
Pre-development air permeability test | - | - |
---|---|---|
Final air permeability test | - | - |
Stage | Occupied |
---|---|
Start date | 16 May 2010 |
Occupation date | |
Location | Stonehaven Grampian Scotland |
Build type | Refurbishment |
Building sector | Private Residential |
Property type | Detached |
Construction type | Masonry Cavity |
Other construction type | |
Party wall construction | |
Floor area | 85 m² |
Floor area calculation method | Approximate Floor Area |
Building certification |
Organisation | |
---|---|
Project lead person | |
Landlord or Client | |
Architect | |
Mechanical & electrical consultant | |
Energy consultant | |
Structural engineer | |
Quantity surveyor | |
Consultant | |
Contractor |
Planned occupancy | |
---|---|
Space heating strategy | |
Water heating strategy | Gas Boiler & Solar Thermal |
Fuel strategy | |
Renewable energy strategy | |
Passive Solar strategy | |
Space cooling strategy | |
Daylighting strategy | |
Ventilation strategy | MVHR |
Airtightness strategy | |
Strategy for minimising thermal bridges | None |
Modelling strategy | |
Insulation strategy | |
Other relevant retrofit strategies | |
Contextual information |
Occupancy | 3 |
---|---|
Space heating | SEDBUK A-rated mains gas condensing boiler. Located in utility room |
Hot water | gas boiler & solar thermal |
Ventilation | MVHR Vent Axia 95% heat recovery. inlets in each bedreeom and 2 in living room. 1 extract in kitchen, 1 in bathroom. All solid PVC ducting. |
Controls | honeywell room thermostat - living room. other radiators on thermostat. 3 set points for MVHR |
Cooking | gas hob, electric oven |
Lighting | 100% compact fluorescent |
Appliances | A+ Rated fridge, freezer and washing machine to each unit |
Renewable energy generation system | |
Strategy for minimising thermal bridges | None |
Storeys | 1 |
---|---|
Volume | 210m³ |
Thermal fabric area | - |
Roof description | |
Roof U-value | - |
Walls description | |
Walls U-value | - |
Party walls description | |
Party walls U-value | - |
Floor description | |
Floor U-value | - |
Glazed doors description | |
Glazed doors U-value | - - |
Opaque doors description | |
Opaque doors U-value | - - |
Windows description | |
Windows U-value | - - |
Windows energy transmittance (G-value) | - |
Windows light transmittance | - |
Rooflights description | |
Rooflights light transmittance | - |
Rooflights U-value | - |