Bradwell
View This Project

Energy target
PassivHaus

Bradwell

Two 2 bedroom semi-detached homes in as part of a social housing project.
Construction type-Project typeNew build
Property typeSemi-Detached SectorPublic Residential
LocationBradwell NorfolkProject owner-
Passivhaus certified building

Bradwell

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 137
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Braemar, Scotland
View This Project

Energy target
-

Braemar, Scotland

Flying Factory Franchisees Stewart and Shields built the 153m2 bungalow for a Self Build client high in the mountains of Scotland in Braemar.
Construction type-Project typeNew build
Property typeDetached SectorPrivate Residential
LocationBraemar -Project ownerBeattie Passive

Braemar, Scotland

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 153
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Bringing Wates homes into the Future
View This Project

Bringing Wates homes into the Future

Wates property structural and low energy refurbishment based on an optimised structural insulated render consisting of a steel cage filled with insulation (Structherm). The void created allows for plumbing and ventilation ducting to provide heat recovery air heating and vent control throughout the house from a heat exchange unit located in the roof space. Other features include air source heat pump supplemented by solar and PV cells, triple glazed windows and doors with reveal detail to improve sealing and solar gain, weather compensating energy controls and a broadband based monitoring system to enable point of use metering information. A porch to reduce energy loss from front door and veranda at the rear for washing to reduce energy...
Construction typeConcrete frameProject typeRefurbishment
Property typeEnd Terrace SectorPublic Residential
LocationBirmingham West MidlandsProject ownerG F Tomlinson Group Limited
Retrofit for the future ZA493T

Bringing Wates homes into the Future

View This Project
Pre-dev ForecastMeasured
CO₂ emissions 146 kg CO₂/m².yr 89 kg CO₂/m².yr 51 kg CO₂/m².yr
Primary energy requirement 702 kWh/m².yr 377 kWh/m².yr 242 kWh/m².yr
Annual space heat demand - 67 kWh/m².yr -
  • Whole house calculation method : SAP
  • Floor area : 75
  • Airtightness : 11.1 m³/m².hr @ 50 Pascals

Planned occupancy : Existing family home. Design enables uninterrupted occupancy. Energy performance improvements is in the main achieved externally

Overview
Quick figures
Bristol Passivhaus
View This Project

Bristol Passivhaus

This residential building stands on the grounds of a listed church with a parish from the 18th century. Due to the heritage of the site, the new build was required to be built in the style of the existing church and parish.
Construction type-Project typeNew build
Property typeDetached SectorPrivate Residential
LocationBristol BristolProject owner-
Passivhaus certified building

Bristol Passivhaus

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 411
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Bristol Passivhaus Plus
View This Project

Bristol Passivhaus Plus

As its certification testifies this building works as a Passivhaus Powerhouse, designed to be largely self-sufficient in heating and hot water. The house is built on a flat plot in the clients large garden in Nailsea, west of Bristol, that used to be an urban infill site. It is tactfully located at the rear of the plot, facing south. To harness the benefits of this orientation, the roof is covered entirely in an integrated 7.3KW PV system. Part of the renewable source of heating and hot water is generated by the Mitsubishi Ecodan air source heat pump with thermal store, and the latest Powerwall 2 TESLA battery is used for storage.
Construction type-Project typeNew build
Property typeDetached SectorPrivate Residential
LocationNailsea, Bristol SomersetProject owner-
Passivhaus certified building

Bristol Passivhaus Plus

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : PHPP
  • Floor area : 153
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Bristol Retrofit
View This Project

Bristol Retrofit

A full thermal retrofit of a mid-century, three-storey property built into a hill and located within a Conservation Area in Bristol. The project included an extension, designed and built to a very energy efficient specification. The extension was needed, both to accommodate home-based business facilities, and to improve access to the lower floor, which is now the kitchen/dining area. A key challenge for this project was to address the amount of thermal bridges created by the excess amount of concrete used during the period of the original construction. Concrete gutters and a balcony have been removed. External wall insulation has been used throughout (U
Construction typeMasonry CavityProject typeRefurbishment
Property typeDetached SectorPrivate Residential
LocationBristol BristolProject ownerFour Walls Consultants

Bristol Retrofit

View This Project
Pre-dev ForecastMeasured
CO₂ emissions 37 kg CO₂/m².yr 17 kg CO₂/m².yr 13 kg CO₂/m².yr
Primary energy requirement 208 kWh/m².yr 83 kWh/m².yr 70 kWh/m².yr
Annual space heat demand 140.3 kWh/m².yr 16.93 kWh/m².yr 14.2 kWh/m².yr
  • Whole house calculation method : SAP
  • Floor area : 201.9
  • Airtightness : 1.85 m³/m².hr @ 50 Pascals

Planned occupancy : Two people with occasional guests. Both occupants work full time from home.

Overview
Quick figures
Bromley Passivhaus
View This Project

Bromley Passivhaus

A detached self-build 5 bedroom home
Construction type-Project typeNew build
Property typeDetached SectorPrivate Residential
LocationBromley LondonProject owner-
Passivhaus certified building

Bromley Passivhaus

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - 16 kWh/m².yr -
  • Whole house calculation method : PHPP
  • Floor area : 208.4
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Bromyard Passivhaus 1
View This Project

Bromyard Passivhaus 1

A private residential Passivehaus in Bromyard, Herefordshire.
Construction type-Project typeNew build
Property type- SectorPrivate Residential
LocationBromyard HerefordshireProject owner-
Passivhaus certified building

Bromyard Passivhaus 1

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : PHPP
  • Floor area : 212
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Bromyard Passivhaus 2
View This Project

Bromyard Passivhaus 2

A private residential Passivhaus in Bromyard, Herefordshire
Construction type-Project typeNew build
Property type- SectorPrivate Residential
LocationBromyard HerefordshireProject owner-
Passivhaus certified building

Bromyard Passivhaus 2

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : PHPP
  • Floor area : 161
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
Bryn Veterinary Centre
View This Project

Bryn Veterinary Centre

Newbuild veterinary practice
Construction type-Project typeNew build
Property typeDetached SectorCommercial
LocationWigan ManchesterProject owner-
Passivhaus certified building

Bryn Veterinary Centre

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 193.66
  • Airtightness : -

Planned occupancy : -