1 - 19 Peek Close, Lavenham, CO10 9FR
View This Project

Energy target
AECB Silver

1 - 19 Peek Close, Lavenham, CO10 9FR

Proposed Affordable Housing Development, Former Depot, off Melford Road, Harwood Place, Lavenham
Construction typeMasonry CavityProject typeNew build
Property typeSemi-Detached SectorPublic Residential
LocationLavenham SuffolkProject ownerParsons & Whittley
AECB Standard certified building

1 - 19 Peek Close, Lavenham, CO10 9FR

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 120.2
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
1 to 16 Pond Field Close, Little Hallingbury, Bishops Stortford, CM22 7FF
View This Project

Energy target
AECB Silver

1 to 16 Pond Field Close, Little Hallingbury, Bishops Stortford, CM22 7FF

Affordable housing development of 16 houses
Construction typeSoftwood frameProject typeNew build
Property typeSemi-Detached SectorPublic Residential
LocationLittle Hallingbury EssexProject ownerParsons + Whittley
AECB Standard certified building

1 to 16 Pond Field Close, Little Hallingbury, Bishops Stortford, CM22 7FF

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 174.8
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
1970s Lancaster retrofit
View This Project
Featured Project

1970s Lancaster retrofit

Retrofit of 1970s semi-detached house using IWI. Designed, built and certified to the AECB Retrofit Standard - Level 2.
Construction typeMasonry CavityProject typeRefurbishment
Property typeSemi-Detached SectorPrivate Residential
LocationLancaster LancashireProject ownerColdProof / Haus Martins
AECB Standard certified building

1970s Lancaster retrofit

View This Project
Pre-dev ForecastMeasured
CO₂ emissions 64 kg CO₂/m².yr 19 kg CO₂/m².yr -
Primary energy requirement 363 kWh/m².yr 79 kWh/m².yr -
Annual space heat demand 189 kWh/m².yr 44 kWh/m².yr -
  • Whole house calculation method : PHPP
  • Floor area : 73.5
  • Airtightness : 1.36 m³/m².hr @ 50 Pascals

Planned occupancy : 2 people - occupancy selected as automatic in PHPP

Overview
Quick figures
2050 Now!  Achieving the standards for 2050, and the potential role for innovative heating solutions in thermally improved homes
View This Project

2050 Now! Achieving the standards for 2050, and the potential role for innovative heating solutions in thermally improved homes

The project will be improving four homes to different levels and exploring the performance of new heating solutions to achieve the optimum balance of energy performance vs. heating input for these different technologies. The three main innovative heating technologies in this project are Baxi's Ecogen domestic CHP (dCHP), Baxi's Ambiflo ASHP and Nuaire's Sunwarm (combined positive input ventilation, solar thermal heating and solar hot water). The dCHP units will be installed in relatively worse performing households and the ASHP units in well insulated houses to understand the level of performance needed from homes to create the right environment for these technologies to achieve significant carbon savings.
Construction typeMasonry CavityProject typeRefurbishment
Property typeSemi-Detached SectorPublic Residential
LocationNewark NottinghamshireProject ownerNottingham Community Housing Association
Retrofit for the future ZA556B

2050 Now! Achieving the standards for 2050, and the potential role for innovative heating solutions in thermally improved homes

View This Project
Pre-dev ForecastMeasured
CO₂ emissions 176 kg CO₂/m².yr 28 kg CO₂/m².yr -
Primary energy requirement 683 kWh/m².yr 121 kWh/m².yr -
Annual space heat demand - 64 kWh/m².yr -
  • Whole house calculation method : SAP
  • Floor area : 81.4
  • Airtightness : -

Planned occupancy : Three people

Overview
Quick figures
27, Cumnor Hill
View This Project

27, Cumnor Hill

Retrofit of a 1920s build.
Construction type-Project typeRefurbishment
Property typeDetached SectorPrivate Residential
LocationBotley, Oxford OxfordshireProject owner-
Passivhaus certified building

27, Cumnor Hill

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - 24.9 kWh/m².yr -
  • Whole house calculation method : PHPP
  • Floor area : 313
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
29, 29a, 31 & 31a Six Mile Bottom Road, West Wratting, Cambridge, CB21 5NE
View This Project

29, 29a, 31 & 31a Six Mile Bottom Road, West Wratting, Cambridge, CB21 5NE

Proposed Affordable Housing Development, Site Adjacent to 27 Six Mile Bottom Road, West Wratting, Cambridge
Construction typeMasonry CavityProject typeNew build
Property typeSemi-Detached SectorPublic Residential
LocationWest Wratting CambridgeshireProject ownerHastoe Housing Association
AECB Standard certified building

29, 29a, 31 & 31a Six Mile Bottom Road, West Wratting, Cambridge, CB21 5NE

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 163.8
  • Airtightness : -

Planned occupancy : -

Overview
Quick figures
5Pev
View This Project
CO2 emissionsPrimary energy requirement

Energy target
-
Renewable electricity

5Pev

Deep retrofit of 1961 linked detached
Construction typeMasonry CavityProject typeRefurbishment
Property typeDetached SectorPrivate Residential
LocationChorlton ManchesterProject ownerWaxwing Energy

5Pev

View This Project
Pre-dev ForecastMeasured
CO₂ emissions 41 kg CO₂/m².yr 13 kg CO₂/m².yr 14 kg CO₂/m².yr
Primary energy requirement 216 kWh/m².yr 62 kWh/m².yr 67 kWh/m².yr
Annual space heat demand - 20 kWh/m².yr -
  • Whole house calculation method : SAP
  • Floor area : 84
  • Airtightness : 0.75 m³/m².hr @ 50 Pascals

Planned occupancy : Two Adults and one baby born 6 months after occupancy. One adult working at any one time not always away from home during day.

Overview
Quick figures
6 and 7, Higher Shippon, Cheriton Bishop
View This Project

6 and 7, Higher Shippon, Cheriton Bishop

One of four pairs of dwellings in a rural location in Devon
Construction type-Project typeNew build
Property typeSemi-Detached SectorPublic Residential
LocationCheriton Bishop DevonProject ownerClassic Builders
AECB Standard certified building

6 and 7, Higher Shippon, Cheriton Bishop

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - - -
Primary energy requirement - - -
Annual space heat demand - - -
  • Whole house calculation method : -
  • Floor area : 141
  • Airtightness : -

Planned occupancy : Standard PHPP occupancy assumptions used

Overview
Quick figures
9 & 11 Arthurs Close
View This Project

9 & 11 Arthurs Close

9 & 11 Arthurs Close (Plot 7 & 8) are new build flats built to meet the AECB Building Standard.
Construction typeSoftwood frameProject typeNew build
Property typeSemi-Detached SectorPublic Residential
LocationPamber HampshireProject ownerW Stirland
AECB Standard certified building

9 & 11 Arthurs Close

View This Project
Pre-dev ForecastMeasured
CO₂ emissions - 25 kg CO₂/m².yr -
Primary energy requirement - 122 kWh/m².yr -
Annual space heat demand - 31 kWh/m².yr -
  • Whole house calculation method : PHPP
  • Floor area : 105.3
  • Airtightness : 1.34 m³/m².hr @ 50 Pascals

Planned occupancy : Two people

Overview
Quick figures
A2 Dominion- Northholt,
View This Project

A2 Dominion- Northholt,

This typical semi-detatched property has poor orientation for exploiting solar gain and the residents will remain in their home during the works, making this a particularly hard to treat property. The rewards however are great, with approx 5.9 million semi detatched properties in England which could be treated similarly. We aim to deliver a highly cost effective and replicable solution, using innovative solutions such as the solar shed , blown underfloor insulation, cork external insulation and bio-foam loft insulation in a holistic design approach. The proposals have been detailed and specified with a strong emphasis on UK based expertise and technologies.
Construction typeMasonry CavityProject typeRefurbishment
Property typeSemi-Detached SectorPublic Residential
LocationLondon Borough of Ealing LondonProject ownerBreyer Group PLC
Retrofit for the future ZA569T

A2 Dominion- Northholt,

View This Project
Pre-dev ForecastMeasured
CO₂ emissions 21 kg CO₂/m².yr 9 kg CO₂/m².yr -
Primary energy requirement 99 kWh/m².yr 41 kWh/m².yr -
Annual space heat demand - 29 kWh/m².yr -
  • Whole house calculation method : PHPP
  • Floor area : 80
  • Airtightness : 7.59 m³/m².hr @ 50 Pascals

Planned occupancy : For the SAP and PHPP modelling an occupancy of 2.1 people has been assumed as per the TSB competition requirements. For the hot water assumptions for sizing the solar thermal system an occupancy of 3 people was assumed which we feel is a more realistic figure for a 3 bedroom house.